Yesterday got this news from d RCAC precidente that d said track is now close,under going a new look and will be re open on 13th May 2005.
Work consist:
1- Resurface total layout(new premix layer - asw standard).
2- Total parameter fencing.
3- Electrical plug points(paddock pillars).
4- Off road track repair.
5- Driver tower upgrading.
:Height extend 3fts.
:Length extend 6fts.
:Width extend 2fts.
Today morning 1stly they wil start wit resurfacing job.
:tire: :tire: :tire:
Work consist:
1- Resurface total layout(new premix layer - asw standard).
2- Total parameter fencing.
3- Electrical plug points(paddock pillars).
4- Off road track repair.
5- Driver tower upgrading.
:Height extend 3fts.
:Length extend 6fts.
:Width extend 2fts.
Today morning 1stly they wil start wit resurfacing job.
:tire: :tire: :tire:
berita yang baik buat penggiat rc.....t/kasih pada yang telah berusaha...
mavic...layout masih sama kan?




















Author




Logged


